Start Date November 2018 |
Completion Date April 2019 |
ChallengeAn explosion caused significant structural damage and widespread soot, char, and ash contamination throughout the parkade and adjoining building. |
ResultsThe significant structural repairs required to the parkade were completed, fully restoring the space. |
ApproachPremier Fire and Flood Restoration mobilized within 48 hours to begin comprehensive restoration services. All surfaces were hepa vacuumed, chem-sponged, and wiped to remove fire-related particulates. The HVAC, mechanical system, electrical system, and electronics were inspected, tested, cleaned, and restored to operational condition. |